Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Last revisionBoth sides next revision
wiki:house [2021/05/03 00:58] jeffwiki:house [2022/03/03 01:38] jeff
Line 1: Line 1:
 ====== House Projects ====== ====== House Projects ======
  
 +  * [[:wiki:projects:house:bomb_shelter]]
 +  * [[https://www.home-assistant.io/installation/linux|Home automation]]
 +  * sennheiser ie300 headphones
 +  * [[https://planningdevelopment.elpasoco.com/planning-development-questions/#1516896260003-69ba88f9-0699|Planning and Development]]
   * [[https://pprbd.org/Download/ResidentialHandout#RHJump|Building Codes]]   * [[https://pprbd.org/Download/ResidentialHandout#RHJump|Building Codes]]
   * [[http://moss-design.com/construction-documents/|House Plans]]   * [[http://moss-design.com/construction-documents/|House Plans]]
Line 12: Line 16:
     * 6x6 supports a 16 ft span     * 6x6 supports a 16 ft span
     * 8x8 supports a 42 ft span     * 8x8 supports a 42 ft span
-  * 6x6 needs a 24 in round concrete pillar +  * 6x6 needs a 18in round concrete pillar they are 20in but there is an overlap of 1in on both sides. 
-  * 6x6 are 8 ft on center +  * 6x6 are 8ft on center 
-  * 2x6 horizontal slats are 2ft vertical spacing+  * 4 inches up into the foundation board for concrete 
 +  * 2x6 horizontal slats are 32in vertical spacing
   * headers are 2 2x6 stacked or just one 2x6   * headers are 2 2x6 stacked or just one 2x6
   * trusses are 2 ply i.e. 2x6 and 2x6 stuck together for a 4x6   * trusses are 2 ply i.e. 2x6 and 2x6 stuck together for a 4x6
   * trusses are 8 ft on center   * trusses are 8 ft on center
   * truss purlins are stood on end for bridging the span   * truss purlins are stood on end for bridging the span
 +  * the dimension of the building matches the outside stringers
 +  * concrete is 4in into the base board
 +  * upper floor
 +    * 2x6 framing
 +    * 32" on center
 +    * zip r3 outside
 +    * zip tape osb
 +    * if heating dominate climate, vapor barrier on the inside
 +    * if cooling dominate climate, vapor barrier on the outside and breathable
 +    * Sounds like it needs to be on both sides. saw one person doing it.
 +  * Design [[https://external-content.duckduckgo.com/iu/?u=http%3A%2F%2Fwww.diypolebarns.com%2Flearn%2Fwp-content%2Fuploads%2F2018%2F05%2Fdiy-pole-barns-pole-barn-posts.jpg&f=1&nofb=1|image]]
  
 ====== Phases ====== ====== Phases ======
Line 27: Line 43:
   * parcel number 3300000561   * parcel number 3300000561
   * get road access - working on it   * get road access - working on it
 +  * [[https://external-content.duckduckgo.com/iu/?u=https%3A%2F%2Fi.pinimg.com%2Foriginals%2F7c%2F6b%2F25%2F7c6b25a5ac1e5fa989b21b64df968c57.jpg&f=1&nofb=1|pump house]]
 +    * [[https://www.kunaudrilling.com/contact-us/|Well driller]]
 +
 +===== Phase 0.1 =====
 +
 +  * build shed
 +  * build small house on top of shed
 +  * add solar to small house
  
 ===== Phase 1 ===== ===== Phase 1 =====
wiki/house.txt · Last modified: 2022/05/06 13:56 by jeff
Back to top
CC Attribution-Share Alike 4.0 International
Driven by DokuWiki Recent changes RSS feed Valid CSS Valid XHTML 1.0