Line 3: Line 3:
 "The best time to attack the problem of scope is up front. If you decide halfway through the project that the design is too ambitious, you will throw out man-years of work on material that will never see the light of day. If you limit your scope during the design phase, your artists, programmers, and level designers will have the time to concentrate on quality, not quantity." "The best time to attack the problem of scope is up front. If you decide halfway through the project that the design is too ambitious, you will throw out man-years of work on material that will never see the light of day. If you limit your scope during the design phase, your artists, programmers, and level designers will have the time to concentrate on quality, not quantity."
  
-[[:movie:design_ideas|Basic Design Principals]]+[[http://www.cybercollege.com/tvp_ind2.htm|Professional's opinion]]
  
-[[:movie:conept_doc|Concept Document]] - Send Link to doc with meeting request - (Tech Lead / 4 hours, Brainstormer)+[[:films:conept_doc|Concept Document]] - Send Link to doc with meeting request - (Tech Lead / 4 hours, Brainstormer)
  
   * Meeting: Concept review and Staff assignment - (Section Managers / 1 hour)   * Meeting: Concept review and Staff assignment - (Section Managers / 1 hour)
Line 11: Line 11:
   * **Await customer approval before continuing**   * **Await customer approval before continuing**
  
-[[:movie:design_doc|Design Document]] - (Tech Lead / 50% of Life Cycle)+[[:films:design_doc|Design Document]] - (Tech Lead / 50% of Life Cycle)
  
   * Meeting: Design Review - Send Link to doc with meeting request - (Project Team / 1 hour)   * Meeting: Design Review - Send Link to doc with meeting request - (Project Team / 1 hour)
Line 18: Line 18:
   * **Await project lead approval before continuing**   * **Await project lead approval before continuing**
  
-[[:movie:test_doc|Test Document]] - (Tech Lead, Tester(s) / 4 hours)+[[:films:test_doc|Test Document]] - (Tech Lead, Tester(s) / 4 hours)
   * Meeting : Finalized Requirements Review (Tech Lead, Tester(s) / 1 hour)   * Meeting : Finalized Requirements Review (Tech Lead, Tester(s) / 1 hour)
   * Populate Tasks within dotProject - (Tech Lead / 1 hour)   * Populate Tasks within dotProject - (Tech Lead / 1 hour)
  
-[[:movie:coding_standards|Development]] (Project Team / 35% of Life Cycle)+[[:films:coding_standards|Development]] (Project Team / 35% of Life Cycle)
  
-  * Status Meetings - Use Task Logs in [[http://dotproject/|dotProject]] +  * Status Meetings - Use Task Logs in [[http://www.j-a-m.net/dotproject/|dotProject]] 
-  * Review Meetings - [[:design:review_proc|Process]]+  * Review Meetings - [[:film:daylies_doc|Daylies]]
  
-[[:movie:test_report|Test]] - Update bugs within dotProject (Independent / 10% of Life Cycle)+[[:films:test_report|Test]] - Update bugs within dotProject (Independent / 10% of Life Cycle)
  
 Deployment (Tech Lead / 5% of Life Cycle) Deployment (Tech Lead / 5% of Life Cycle)
 +
 +{{:wiki:film_production_pipeline.jpg?200|Film Production Pipeline}}
wiki/films.1213722051.txt.gz · Last modified: 2020/11/19 14:21 (external edit)
Back to top
CC Attribution-Share Alike 4.0 International
Driven by DokuWiki Recent changes RSS feed Valid CSS Valid XHTML 1.0