Differences
This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
wiki:projects:tetris [2009/07/28 16:54] – created jeff | wiki:projects:tetris [2020/11/19 14:21] (current) – external edit 127.0.0.1 | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== Tetris | + | ====== Tetris ====== |
- | "The best time to attack the problem of scope is up front. If you decide halfway through the project that the design is too ambitious, you will throw out man-years of work on material that will never see the light of day. If you limit your scope during the design phase, your artists, programmers, | + | * Documentation |
+ | * [[wiki: | ||
+ | * [[wiki: | ||
+ | * [[wiki: | ||
+ | * [[wiki: | ||
+ | * [[wiki: | ||
- | [[: | + | * Events |
+ | * Concept Meeting - Event Date - Notes (Make it a link to a new page) | ||
+ | * Design | ||
+ | * Product Review #Part | ||
+ | * Test Review #Part | ||
- | [[:design:model_reqs|Model Requirements]] | + | * Development |
+ | * [[wiki:projects:tetris: | ||
+ | * All Development will be in: [[svn+ssh:// | ||
- | [[:wiki:conept_doc|Concept Document]] - Send Link to doc with meeting request - (Tech Lead / 4 hours, Brainstormer) | + | * Release |
+ | * [[wiki:projects: | ||
- | * Meeting: Concept review and Staff assignment - (Section Managers / 1 hour) | ||
- | * **Deliverable**: | ||
- | * **Await customer approval before continuing** | ||
- | |||
- | [[: | ||
- | |||
- | * Meeting: Design Review - Send Link to doc with meeting request - (Project Team / 1 hour) | ||
- | * Populate Tasks within dotProject - (Tech lead / part of the design work) | ||
- | * **Deliverable**: | ||
- | * **Await project lead approval before continuing** | ||
- | |||
- | [[: | ||
- | * Meeting : Finalized Requirements Review (Tech Lead, Tester(s) / 1 hour) | ||
- | * Populate Tasks within dotProject - (Tech Lead / 1 hour) | ||
- | |||
- | [[: | ||
- | |||
- | * Status Meetings - Use Task Logs in [[http:// | ||
- | * Review Meetings - [[: | ||
- | |||
- | [[: | ||
- | |||
- | Deployment (Tech Lead / 5% of Life Cycle) |