Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
wiki:house [2021/05/09 21:21] – jeff | wiki:house [2022/05/06 13:56] (current) – [Phase 1] jeff | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== House Projects ====== | ====== House Projects ====== | ||
+ | * [[: | ||
+ | * [[https:// | ||
+ | * sennheiser ie300 headphones | ||
+ | * [[https:// | ||
* [[https:// | * [[https:// | ||
* [[http:// | * [[http:// | ||
Line 14: | Line 18: | ||
* 6x6 needs a 18in round concrete pillar they are 20in but there is an overlap of 1in on both sides. | * 6x6 needs a 18in round concrete pillar they are 20in but there is an overlap of 1in on both sides. | ||
* 6x6 are 8ft on center | * 6x6 are 8ft on center | ||
+ | * 4 inches up into the foundation board for concrete | ||
* 2x6 horizontal slats are 32in vertical spacing | * 2x6 horizontal slats are 32in vertical spacing | ||
* headers are 2 2x6 stacked or just one 2x6 | * headers are 2 2x6 stacked or just one 2x6 | ||
Line 21: | Line 26: | ||
* the dimension of the building matches the outside stringers | * the dimension of the building matches the outside stringers | ||
* concrete is 4in into the base board | * concrete is 4in into the base board | ||
+ | * upper floor | ||
+ | * 2x6 framing | ||
+ | * 32" on center | ||
+ | * zip r3 outside | ||
+ | * zip tape osb | ||
+ | * if heating dominate climate, vapor barrier on the inside | ||
+ | * if cooling dominate climate, vapor barrier on the outside and breathable | ||
+ | * Sounds like it needs to be on both sides. saw one person doing it. | ||
+ | * Design [[https:// | ||
====== Phases ====== | ====== Phases ====== | ||
Line 46: | Line 60: | ||
* 16 foot tall first floor | * 16 foot tall first floor | ||
* 10 foot tall second floor | * 10 foot tall second floor | ||
+ | * Door opening at least 130in wide | ||
* water well | * water well | ||
* septic tank | * septic tank |