Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
wiki:house [2021/05/03 00:56] jeffwiki:house [2022/05/06 13:56] (current) – [Phase 1] jeff
Line 1: Line 1:
 ====== House Projects ====== ====== House Projects ======
  
 +  * [[:wiki:projects:house:bomb_shelter]]
 +  * [[https://www.home-assistant.io/installation/linux|Home automation]]
 +  * sennheiser ie300 headphones
 +  * [[https://planningdevelopment.elpasoco.com/planning-development-questions/#1516896260003-69ba88f9-0699|Planning and Development]]
   * [[https://pprbd.org/Download/ResidentialHandout#RHJump|Building Codes]]   * [[https://pprbd.org/Download/ResidentialHandout#RHJump|Building Codes]]
   * [[http://moss-design.com/construction-documents/|House Plans]]   * [[http://moss-design.com/construction-documents/|House Plans]]
Line 12: Line 16:
     * 6x6 supports a 16 ft span     * 6x6 supports a 16 ft span
     * 8x8 supports a 42 ft span     * 8x8 supports a 42 ft span
-  * 6x6 needs a 24 in round concrete pillar +  * 6x6 needs a 18in round concrete pillar they are 20in but there is an overlap of 1in on both sides. 
-  * 6x6 are 8 ft on center +  * 6x6 are 8ft on center 
-  * 2x6 horizontal slats are 2ft vertical spacing+  * 4 inches up into the foundation board for concrete 
 +  * 2x6 horizontal slats are 32in vertical spacing
   * headers are 2 2x6 stacked or just one 2x6   * headers are 2 2x6 stacked or just one 2x6
   * trusses are 2 ply i.e. 2x6 and 2x6 stuck together for a 4x6   * trusses are 2 ply i.e. 2x6 and 2x6 stuck together for a 4x6
 +  * trusses are 8 ft on center
 +  * truss purlins are stood on end for bridging the span
 +  * the dimension of the building matches the outside stringers
 +  * concrete is 4in into the base board
 +  * upper floor
 +    * 2x6 framing
 +    * 32" on center
 +    * zip r3 outside
 +    * zip tape osb
 +    * if heating dominate climate, vapor barrier on the inside
 +    * if cooling dominate climate, vapor barrier on the outside and breathable
 +    * Sounds like it needs to be on both sides. saw one person doing it.
 +  * Design [[https://external-content.duckduckgo.com/iu/?u=http%3A%2F%2Fwww.diypolebarns.com%2Flearn%2Fwp-content%2Fuploads%2F2018%2F05%2Fdiy-pole-barns-pole-barn-posts.jpg&f=1&nofb=1|image]]
  
 ====== Phases ====== ====== Phases ======
Line 25: Line 43:
   * parcel number 3300000561   * parcel number 3300000561
   * get road access - working on it   * get road access - working on it
 +  * [[https://external-content.duckduckgo.com/iu/?u=https%3A%2F%2Fi.pinimg.com%2Foriginals%2F7c%2F6b%2F25%2F7c6b25a5ac1e5fa989b21b64df968c57.jpg&f=1&nofb=1|pump house]]
 +    * [[https://www.kunaudrilling.com/contact-us/|Well driller]]
 +
 +===== Phase 0.1 =====
 +
 +  * build shed
 +  * build small house on top of shed
 +  * add solar to small house
  
 ===== Phase 1 ===== ===== Phase 1 =====
Line 34: Line 60:
   * 16 foot tall first floor   * 16 foot tall first floor
   * 10 foot tall second floor   * 10 foot tall second floor
 +  * Door opening at least 130in wide
   * water well   * water well
   * septic tank   * septic tank
wiki/house.1620003415.txt.gz · Last modified: 2021/05/03 00:56 by jeff
Back to top
CC Attribution-Share Alike 4.0 International
Driven by DokuWiki Recent changes RSS feed Valid CSS Valid XHTML 1.0